Tue 8 Feb 2011
New Rally Engineering Area
We moved in yesterday (2/7/2011). Unpacking went surprisingly well.
The whole engineering space has an overhead power and network grid that allows to easily configure team spaces. In the next couple of weeks we’ll be getting “T” shaped mobile walls to separate the area. Here are some pics of our new space on 3333 Walnut.










[...] This post was mentioned on Twitter by Steven Mak, TimThePM. TimThePM said: Jealous! RT @rallysoftware: Check out our Engineering blog for photos of the engineering space in our new building http://bit.ly/fmQlzk [...]
Beer on tap? Awesome. Although the overhead stuff makes me think of the industrial revolution a bit
http://www.fullissue.com/wp-content/uploads/industrial-revolution-300×222.jpg
Congratulations Rally on your move. Thanks for so generously sharing your plans with the community.
Congrats on the move. Glad everything went smoothly.
Jeff
Looks very sweet. Do you also have big visible indicators around?
@AgileBill — we just installed a build light that tracks the health of our automated tests. When tests fail we are notified by the red light attached to the overhead rails.
Not that our tests fail very often…. *ahem*